78
Engineering Optimization of Boiler and Evaporative Cooling Waste Heat Recovery Systems for Steel Mill in Reheating Furnaces
Choi, So-Won; Lee, Eul-Bum; Kim, Geon-Woo, Engineering Optimization of Boiler and Evaporative Cooling Waste Heat Recovery Systems for Steel Mill in Reheating Furnaces, Presentation only (paper ID=elecs2025-138), 9th European Conference on Electrical Engineering and Computer Science (ELECS 2025), 21-23 December 2025; Athens, Greece; https://www.elecs.org/
-
77
Exhaust Gas Guidance Model to Enhance Combustion Efficiency for Power Plant Boilers Using Partial Least Squares Regression
Choi, S.W.; Yang, S.P.; Lee, E.B.; Lee, S. M. Exhaust Gas Guidance Model to Enhance Combustion Efficiency for Power Plant Boilers Using Partial Least Squares Regression. The 8th International Conference on Power and Energy Applications (ICPEA 2025). 23-25 October 2025; Shanghai, Chian; https://www.icpea.org/
-
76
Development of a Combustion Pattern Optimization Model for Steam Power Plants Based on Random Forest Algorithm
Choi, So-Won; Lee, Kyu-Jeong; Lee, Eul-Bum; Kim, Geon-Woo; Development of a Combustion Pattern Optimization Model for Steam Power Plants Based on Random Forest Algorithm , 2025 US-Korea Conference on Science, Technology and Entrepreneurship (UKC 2025), 5-9 August, 2025; Atlanta, USA; https://ukc.ksea.org/
-
75
Hazard Identification Model (HIM) for Concurrent Works in Steel Plant Maintenance Using Job Safety Analysis (JSA)
Choi, S.W.; Lee, C.S.; Lee, E.B. Hazard Identification Model (HIM) for Concurrent Works in Steel Plant Maintenance Using Job Safety Analysis (JSA). The 2025 10th International Conference on Cloud Computing and Big Data Analytics (ICCCBDA), 24-26 April 2025; Chengdu, China; https://doi.org/10.1109/ICCCBDA64898.2025.11030511
-
74
Application of an Advanced Dijkstra Algorithm for Automation Systems of 3D Piping Routing
Choi, So-Won; Lee, Eul-Bum, Application of an Advanced Dijkstra Algorithm for Automation Systems of 3D Piping Routing, The 8th International Conference on Communication and Information Systems 2024 (ICCIS 2024), 18-20 October, 2024, Shenzhen, China; http://www.iccis.org/ https://doi.org/10.1109/ICCIS63642.2024.10779417
-
73
Development of Artificial intelligence (Al)-Based Automatic Piping Route Design Technology for EPC Projects
Choi, So-Won; Lee, Eul-Bum, Development of Artificial intelligence (Al)-Based Automatic Piping Route Design Technology for EPC Projects, 2024 US-Korea Conference on Science, Technology and Entrepreneurship (UKC 2024), 21-24 August, 2024; San Francisco, USA; https://ukc2024.ksea.org/
-
72
A Delay Liquidated Damages (DLD) Mitigation Model based on Earned Schedule (ES) and Earned Value Management System (EVMS) Concepts
Choi, So-Won: Lee, Eul-Bum, A Delay Liquidated Damages (DLD) Mitigation Model based on Earned Schedule (ES) and Earned Value Management System (EVMS) Concepts, The 41th International Association for Automation and Robotics in Construction (ISARC 2024), 3-5 June, 2024, Lille, France; https://www.iaarc.org/ https://doi.org/10.22260/ISARC2024/0049
-
71
U-net architecture-based image segmentation model development for defect detection in hot rolling mill
Park, Sea-Eun: Choi, So-Won; and Lee, Eul-Bum, U-net architecture-based image segmentation model development for defect detection in hot rolling mill, The International Conference series on Geotechnics, Civil Engineering and Structures (CIGOS 2024), April 4-5, 2024; Ho Chi Minh City, Vietnam; https://cigos2024.sciencesconf.org/ https://doi.org/10.1007/978-981-97-1972-3_81
-
70
Knowledge Graph-based a Purchase Order Knowledge Retrieval Model (POKREM) for Steel Plants
Choi, So-Won: Lee, Kyu-Jeong: Cha, Ho-Jin: and Lee, Eul-Bum: Knowledge Graph-based a Purchase Order Knowledge Retrieval Model (POKREM) for Steel Plants, The 7th International Conference on Communication and Information Systems (ICCIS 2023), October 20-22, 2023, Chongging, China; https://www.iccis.org/ https://doi.org/10.1109/ICCIS59958.2023.10453819
-
69
Automated Estimation Model for Liquidated Damages in General Provisions of Equipment Purchasing Orders
Park, Sea-Eun; Choi, So-Won; and Lee, Eul-Bum; Automated Estimation Model for Liquidated Damages in General Provisions of Equipment Purchasing Orders, The 36th US-Korea Conference (UKC 2023), August 2-5, 2023, Dallas, Texas; https://www.ukc.ksea.org/
-
68
Development of digital rules for optimal auto-routing design of pipe
Park, Sea-Eun: Choi, So-Won: and Lee, Eul-Bum; Development of digital rules for optimal auto-routing design of pipe, the 8th International Symposium on Life-Cycle Civil Engineering (IALCCE 2023), July 2-6, 2023, Milan, Italy; https://ialcce2023.org/ http://dx.doi.org/10.1201/9781003323020-407
-
67
Table Recognition and Comparison Technology with AI in Technical Specifications for Equipment Purchasing Order
Choi, Seong-Jun; Choi, Sowon; Kim, Chae-Yeon; Lee, Eul-Bum; Table Recognition and Comparison Technology with AI in Technical Specifications for Equipment Purchasing Order, The 35th US-Korea Conference (UKC) 2022; paper no: U22CEA-2-1, August 17-20, 2022, Arlington, VA, USA; https://seattle.ksea.org/event/ukc-2022-science-and-technology-in-the-wake-of-the-pandemic/
-
66
Application of Machine-learning (ML) technology for the use of big data in the design and construction stages of the Engineering, Procurement, Construction (EPC) project
Choi, Seong-Jun; Choi, So-Won; Park, Min-Ji; Lee, Eul-Bum; Application of Machine-learning (ML) technology for the use of big data in the design and construction stages of the Engineering, Procurement, Construction (EPC) project, The 9th International Conference on Construction Engineering and Project Management (ICCEPM 2022), June. 20-23, 2022, Las Vegas, NV, USA; www.iccepm2022.com https://www.koreascience.kr/article/CFKO202221543093698.pdf
-
65
Predictive Maintenance for Turbofan Engines Based on Remaining Useful Life Analysis with Machine-learning (ML) and Big-data Applications
Choi, Sowon; Lee, Eul-Bum; 2022. Predictive Maintenance for Turbofan Engines Based on Remaining Useful Life Analysis with Machine-learning (ML) and Big-data Applications. The 4th International Conference on Big Data Engineering (BDE 2022). May 26- 28, 2022, Virtual; http://www.bde.net
-
64
Automatic Risks Detection and Comparison Techniques for General Conditions of Technical Documents in Purchasing Order
Kim, Chae-Yeon; Choi, Sowon; Jeong, Jong-Gwan; Lee, Eul-Bum; 2022. Automatic Risks Detection and Comparison Techniques for General Conditions of Technical Documents in Purchasing Order. In 2022 8th International Conference on Computer Technology Applications (ICCTA 2022), May 12-14, 2022, Vienna, Austria; http://www.iccit.org/ https://doi.org/10.1145/3543712.3543721
-
63
Automatic conversion of table contents from PDF technical specification documents into database using Al Optical Character Recognition (OCR)
Park, Minji; Kim, Chae-Yeon; Choi, So-Won; Hwang, Jong-Hwi; Lee, Eul-Bum; Automatic conversion of table contents from PDF technical specification documents into database using Al Optical Character Recognition (OCR); The 4th International Conference on Communicat ion and Computational Technologies (ICCCT 2022), February 26-27, 2022, Jaipur, India; https://www.iccct22.scrs.in/ http://dx.doi.org/10.1007/978-981-19-3951-8_22
-
62
An Al-based Automatic Risks Detection Solution of Plant Owner's Requirements in Equipment Purchasing-Order
Kim, Chae-Yeon; Choi, Sowon; Jeong, Jong-Gwan; Park, Minji; Lee, Eul-Bum; An Al-based Automatic Risks Detection Solution of Plant Owner's Requirements in Equipment Purchasing-Order, paper number 8088; The 34th US-Korea Conference (UKC) 2021 ; December 15-18, 2021, Los Angeles, CA, USA; https://ukc.ksea.org/ukc2021/
-
61
Application of 4D BIM Simulations for Safety and Schedule Integration of a Reconstruction Project for Oxygen Plant in Steel Works in Korea
Kim. Chae-Yeon; Lee, Jae-Sung; Roh, Ho-Young; Lee, Eul-Bum; Application of 4D BIM Simulations for Safety and Schedule Integration of a Reconstruction Project for Oxygen Plant in Steel Works in Korea. CIGOS 2021 (6th International Conference on Geotechnics, Civil Engineering and Struct ures, Ha Long, Vietnam, October 28-29. 2021; https://cigos2021.sciencesconf.org http://dx.doi.org/10.1007/978-981-16-7160-9_150
-
60
Risk Extraction and Analysis of Technical Specifications Based on Machine-Learning Algorithms for EPC Bid Documents
Park, Minji; Lee, Seung-yeab; Kim, Jong-hyun; Lee, Eul-Bum; Risk Extraction and Analysis of Technical Specifications Based on Machine-Learning Algorithms for EPC Bid Documents; The 38th International Council for Research and Innovation in Building and Construction (CIB) W78 - Linked Data in Architecture and Const ruction research community (LDAC) Conference 2021; October 11- 15, 2021, Luxembourg; https://www.cibw78-ldac-2021.lu/ https://itc.scix.net/pdfs/w78-2021-paper-021.pdf
-
59
Syntactic Analysis for Decision-making Support System in Engineering-Procurement-Construction (EPC) Field
Choi, Sujin; Choi, Sowon; Lee, Seung-yeab; Lee, Eul-Bum; Syntactic Analysis for Decision-making Support System in Engineering-Procurement-Construction (EPC) Field; The 7th International Conference on Computer Technology Applications (ICCTA); July. 13-15, 2021; Vienna, Austria; http://www.iccit.org/iccta2021.html https://doi.org/10.1145/3477911.3477912
-
58
Development of Machine Learning based Engineering Integration Module (MEIM) for Decision Making Support in the EPC Project
Lee, Seung-yeab; Kim, Hyun Soo; Lee, Eul-Bum; Development of Machine Learning based Engineering Integration Module (MEIM) for Decision Making Support in the EPC Project; The 3rd International Conference on Big Data Engineering (BDE 2021); May. 29-31, 2021; Shanghai, China; http://www.bde.net/
-
57
Lexicon based Natural Language Processing (NLP) and Semantic Analysis of Contractual Risks on Engineering, Procurement & Construction (EPC) projects
Choi, Sowon; Baek, Seong-Bin; Lee, Eul-Bum; Lexicon based Natural Language Processing (NLP) and Semantic Analysis of Contractual Risks on Engineering, Procurement & Construction (EPC) projects, The 2nd International Conference on Communication and Intelligent Systems (ICCIS 2020), December. 26-27, 2020; Jaipur & Kota, India; https://iccis20.scrs.in/; https://www.iccis20.scrs.in/kcfinder/upload/files/Souvenir.pdf
-
56
Application of Artificial Intelligence and Big data to Decision-making Support for Engineering-Procurement-Construction (EPC) Projects
Choi, Sowon; Lee, Seung-yeab; Choi, Sujin; Lee, Eul-Bum; Application of Artificial Intelligence and Big data to Decision-making Support for Engineering-Procurement-Construction (EPC) Projects; paper number U20CEA-14-1; The 15th US-Korea Conference (UKC) 2020; December. 14 - 17, 2020, Virtual, USA; https://ukc.ksea.org/ukc2020/ukc-2020-awardee-list/ Best Presentation Award Winner - CEA, Sowon Choi
-
55
Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea
Jung, In-Hye, Roh, Ho-Young; Lee, Eul-Bum, Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea, The 8th International Conference on Construction Engineering and Project Management (ICCEPM), December 7-8, 2020, Hong Kong; https://www.iccepm.org/ko/about
-
54
Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors Schedule-Cost, No.40
Kim, Myoeong Hun; Lee, Eul-Bum; Cho, Jae Min, Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors Schedule-Cost, No.40, The 5th International Congress on Energy Efficiency and Energy Related Materials, ENEFM 2019, October 22~28, 2019, Oludeniz (Fethye), Turkey; http://www.enefmcongress.org/
-
53
Development of AI-based engineering Big Data integrated analysis system for decision-making support in the Engineering-Procurement-Construction (EPC) industry
Lee, Jung-Hyun; Kim, Hyun-Soo; Lee, Seung-Yeob; Lee, Eul-Bum, Development of AI-based engineering Big Data integrated analysis system for decision-making support in the Engineering-Procurement-Construction (EPC) industry, The 37th CIB W78 Information Technology for Construction Conference (CIB W78), August 18-20, 2020, São Paulo, Brazil, pp. 58-68; http://dx.doi.org/10.46421/2706-6568.37.2020.paper005
-
52
To develop an intelligent integrated support system for engineering project (E-PMS): DECRIS and DLDs analysis
Cho, Jae-Min; Jang, Sin-Ae; Lee, Eul-Bum; Lee, Ju-Hoon: To develop an intelligent integrated support system for engineering project (E-PMS): DECRIS and DLDs analysis, Information Technology for Construction Conference (CIB W78), August 18-20, 2020, São Paulo, Brazil, pp. 46-57; http://www.pcc.usp.br/icccbe-w78-2020 http://dx.doi.org/10.46421/2706-6568.37.2020.paper004
-
51
Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea
Roh, Ho-Young; Hwang, Do Kyung; Jung In Hye; Lee, Eul-Bum; Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea, The 15th International Congress of Logistics and SCM Systems (ICLS 2020), July 1-3, 2020, Poznan Poland; http://icls2020.put.poznan.pl/ https://doi.org/10.1007/978-3-642-33857-1_9
-
50
AI & NLP (Natural Language Processing) Applications to the Risks Management of EPC Contracts
Kim, Yuri; Lee, Eul-Bum; Choi, Sujin, AI & NLP (Natural Language Processing) Applications to the Risks Management of EPC Contracts; Global EPC PM for O&G Industry, April 1-3, 2020, Amsterdam, Netherland; https://www.world-energy-hub.com/
-
49
Application of Natural Language Processing (NLP) and Text-mining of Big-data to Engineering-Procurement-Construction (EPC) Bid and Contract Documents
Kim, Yuri; Lee, Eul-Bum; Lee, Jung-hyun; Lee, Ju-Hoon, Application of Natural Language Processing (NLP) and Text-mining of Big-data to Engineering-Procurement-Construction (EPC) Bid and Contract Documents, The 6th International Conference on Data Science and Machine Learning Applications (CDMA 2020), March 4-5, 2020, Riyadh, Saudi Arabia, http://www.ieeepsu.org/cdma/; https://dx.doi.org/10.1109/CDMA47397.2020.00027
-
48
Text-mining and Natural Language Processing (NLP) Application to engineering EPC Projects Invitation to Bid (ITB) based on FIDIC Silver Book
Lee, Eul-Bum, Text-mining and Natural Language Processing (NLP) Application to engineering EPC Projects Invitation to Bid (ITB) based on FIDIC Silver Book, FIDIC International Contract Users’ Conference-2019, December 3rd, 2019, West London; https://informaconnect.com/fidic-international-contract-users/
-
47
A Study on the Application of AWP Process and Integrated Platform for Productivity Improvement in Construction Projects
Park, Jung-Chul; Kim, Hyun-Soo; Lee, Jung-Hyun; Lee, Eul-Bum, A Study on the Application of AWP Process and Integrated Platform for Productivity Improvement in Construction Projects, Korea Institute of Construction Engineering and Management (KICEM) Annual Conference-2019, November 15, 2019, Ilsan, Korea. http://2019conference.kicem.or.kr/data/pdf/P-52.pdf
-
46
DLDs decision model using ES-based shortening algorithm
Cho, Jae Min; Lee, Eul-Bum, DLDs decision model using ES-based shortening algorithm, The 8th International Multi-Conference on Engineering and Technology Innovation 2019 (IMETI 2019), November 15-19, 2019, Kaohsiung, Taiwan; http://imeti.org/IMETI2019/
-
45
Automatic Development of Material Requisition for Purchasing Order for EPC Projects
Jung, In Hye; Roh, Ho Young.; Lee, Eul-Bum, Automatic Development of Material Requisition for Purchasing Order for EPC Projects, 2019 US-Korea Conference (UKC), August 14-17, 2019, Rosemont, IL, USA; https://ukc.ksea.org/ukc2019/
-
44
AI-based big-data decision making support systems for Korean contractor’s life-cycle project management of overseas Engineering-Procurement-Construction (EPC)
Cho, Jae Min; Roh, Ho-Young; Lee, Eul-Bum; Kim, Hyun-Soo; AI-based big-data decision making support systems for Korean contractor’s life-cycle project management of overseas Engineering-Procurement-Construction (EPC), International Conference on Big-Data Engineering (BDE 2019), June 11~13, 2019, Hong Kong, China; http://www.bde.net/BDE2019.html /Best Presentation Award Winner - Lee, Eul-Bum
-
43
Smart 4D process visualization solution using BIM
Park, Jung-Chul; Kim, Hyun-Soo; Lee, Eul-Bum; Cho, Jae Min, Smart 4D process visualization solution using BIM, Korea Institute of Building Information Modeling Conference, June 13, 2019, Seoul, South Korea; http://kibim.or.kr/Conference/Conferencelist.asp?AC=0&CODE=CC20190301&B_CATE=BBC1
-
42
Complement of 3D scanning using image-based 3D modeling
Jung, In Hye; Rho, Ho-Young; Lee, Eul-Bum, complement of 3D scanning using image-based 3D modeling, Korea Institute of Building Information Modeling Annual Conference, June 13, 2019, Seoul, South Korea.
-
41
A Study of the AI Based Engineering Big Data Integrated Analysis Support System Development Methodology
Kim, Hyun-Soo; Park, Jung-Chul; Park, Byeong-Hoon; Lee, Eul-Bum, A Study of the AI Based Engineering Big Data Integrated Analysis Support System Development Methodology, KICEM Annual Conference-2018, November 9, 2018, Seoul, Korea
-
40
Intelligent- PM (Project Management) for Smart Engineering
Lee, Eul-Bum, Intelligent- PM (Project Management) for Smart Engineering, Offshore Korea Technical Conference 2018, October 10-11, 2018, Busan, Korea
-
39
Lessons Learned from Applying Earned Value Management System to Infrastructure Construction Project: Case Study
Pyo, Kyeong Yeol and Lee, Eul-Bum, Lessons Learned from Applying Earned Value Management System to Infrastructure Construction Project: Case Study, 2017 International Conference on Construction Engineering and Project Management (ICCEPM), October 28 – 31, 2017, Chengdu, China
-
38
Oil & Gas Project Cost Estimation: Tools & Practice
Lee, Eul-Bum, Oil & Gas Project Cost Estimation: Tools & Practice, Offshore Korea Conference 2017, September 19-20, 2017, Busan, Korea
-
37
Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project
Lee, Jung Heon; Yoon, Sang Mun; Lee, Eul-Bum, Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea https://doi.org/10.6106/ICCEPM.2015.0629
-
36
Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective
Han, Ki Jeong; Kim, Yong Ho; Lee, Eul-Bum, Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Projects: Contractor’s Perspective, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea https://doi.org/10.6106/ICCEPM.2015.0718
-
35
Implementing Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance And Rehabilitation In California
Lee, Eul-Bum; Kim, Chang Mo, Implementing Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance And Rehabilitation In California, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea https://doi.org/10.6106/ICCEPM.2015.0376
-
34
Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A.: Automatic M&R Sequence Selection
Kim, Chang-Mo; Lee, Eul-Bum, Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A.: Automatic M&R Sequence Selection, The 8th International Conference on Road and Airfield Pavement Technology (ICPT), July 14-18, 2013, Taipei, Taiwan
-
33
Steel Plant Construction (EPC) Project Case Study: Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation
Jin, K.B.; Kim, Y.H.; Lee, Eul-Bum; Suh, S.H., Steel Plant Construction (EPC) Project Case Study: Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation, The 5th International Conference on Construction Engineering and Project Management (ICCEPM 2013), January 9-11, 2013, Orange County, California, USA https://doi.org/10.6106/ICCEPM.2013.0145
-
32
Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A.
Kim, C.M.; Lee, Eul-Bum, Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A., KICEM Conference, Nov 9-10, 2012, Daegu, Korea
-
31
Enhancement of EPC Plant Project Management from Lessons Learned: A Case Study of Gas Gathering Project in Nigeria
Song, J. H.; Lee, E. B., Enhancement of EPC Plant Project Management from Lessons Learned: A Case Study of Gas Gathering Project in Nigeria, KICEM Conference, Nov 9-10, 2012, Daegu, Korea.
-
30
A Forensic Case Study of a Refinery Upgrading Project in Thailand: Lessons Learned Implementation
Min, S.K; Lee, Eul-Bum, A Forensic Case Study of a Refinery Upgrading Project in Thailand: Lessons Learned Implementation, KICEM Conference, Nov 9-10, 2012, Daegu, Korea
-
29
Systematic Procedures to Determine Incentive/Disincentive Dollar Amounts for Highway Transportation Construction Projects
Pyeon, J.H.; Lee, Eul-Bum, Systematic Procedures to Determine Incentive/Disincentive Dollar Amounts for Highway Transportation Construction Projects, Mineta Transportation Institute, San José State University, Report no. CA-MTI-12-2908, Grant no. DTRT07-G-0054; http://transweb.sjsu.edu/PDFs/research/2908-highway-transportation-construction-incentive-disincentive-amounts.pdf
-
28
Cost Estimate Modeling of Transportation Management Plans for Highway Projects
Pyeon, J.H.; Lee, Eul-Bum; Ellis, R.D.; Park, T.H., Cost Estimate Modeling of Transportation Management Plans for Highway Projects, Mineta Transportation Institute, San José State University, Report no. CA-MTI-12-1007, Grant no. DTRT07-G-0054; http://transweb.sjsu.edu/PDFs/research/1007-cost-estimate-modeling-transportation-management-highway-projects.pdf
-
27
Life Cycle Environmental Impacts From Asphalt Pavement Rehabilitation With Different Rolling Resistance
Wang, T.; Lee, I. S.; Harvey, J.; Kendall, A.; Lee, Eul-Bum; Kim, C.M., Life Cycle Environmental Impacts From Asphalt Pavement Rehabilitation With Different Rolling Resistance, submitted to the Transportation Research Board 91st Annual Meeting, Transportation Research Board, National Research Council, Washington, D.C., January, 2012.
-
26
I-15 Ontario Project: Technology Implementation for Accelerated Concrete Pavement Rehabilitation
Lee, Eul-Bum; Lim, S., W.; den Hartog, J., C.; Thomas, D., K., I-15 Ontario Project: Technology Implementation for Accelerated Concrete Pavement Rehabilitation, National Conference On Preservation, Repair, And Rehabilitation Of Concrete Pavements, FHWA, AASHTO, ACPA, April. 22–24, 2009, St.Louis,Missouri; http://www.fhwa.dot.gov/pavement/concrete/2009cptpconf.cfm https://trid.trb.org/View/1252557
-
25
CA4PRS: A Decision-support Tool for Rapid Highway Renewal
Lee, Eul-Bum; Sivaneswaran, N.; Harvey, J.T; Lim, S.W, CA4PRS: A Decision-support Tool for Rapid Highway Renewal, Paper No.11, The 1st International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, Florida, February. 9-12, 2009.
-
24
Traffic Monitoring Study With Surveillance Systems: I-15 Devore II Rehabilitation Project In California
Lee, Eul-Bum; Kim, C.M.; Tadi, R.R; Lim, S.W., Traffic Monitoring Study With Surveillance Systems: I-15 Devore II Rehabilitation Project In California, Paper No.30238, 15th World Congress on Intelligent Transport Systems, New York City, New York, November. 16-20, 2008.
-
23
Innovative Technologies And Proactive Public Outreach to Minimize Traffic Inconvenience In Urban Highway Rehabilitation
Lee, Eul-Bum; Thomas, D., Innovative Technologies And Proactive Public Outreach to Minimize Traffic Inconvenience In Urban Highway Rehabilitation, Public Roads, Federal Highway Administration, 2007.
-
22
Garnering Public Support by Implementing a Comprehensive Public Outreach Program
Lee, Eul-Bum; Samadian, M., Garnering Public Support by Implementing a Comprehensive Public Outreach Program, Public Involvement Poster Session (No.: P07-0573) in the Transportation Research Board 86th Annual Meeting, Transportation Research Board, National Research Council, Washington, D.C., 2007.
-
21
Accelerated Long-life Asphalt Concrete Pavement Rehabilitation: I-710 Long Beach (CA) Project Experience
Lee, Eul-Bum, Accelerated Long-life Asphalt Concrete Pavement Rehabilitation: I-710 Long Beach (CA) Project Experience, Road and Bridges, Scranton Gillette Communications, Inc., 2007.
-
20
Accelerated reconstruction of I-15 devore corridor
Lee, Eul-Bum; Thomas, D., Accelerated reconstruction of I-15 devore corridor, Public Roads, Volume 70 (Issue 4), 2007. https://trid.trb.org/View/804813
-
19
Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects In California
Lee, Eul-Bum; Choi, K.; Harvey, J.T., Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects In California, International Conference on Long-Life Concrete Pavements, Federal Highway Administration, Chicago, Illinois, October. 24-27, 2006; http://www.fhwa.dot.gov/pavement/concrete/2006conf.cfm
-
18
Traffic demand reduction using an automated work zone information system for urban freeway rehabilitation
Lee, Eul-Bum; Kim, C.M.; Harvey, J.T, Traffic demand reduction using an automated work zone information system for urban freeway rehabilitation, Applications of Advanced Technology in Transportation - Proceedings of the Ninth International Conference on Applications of Advanced Technology in Transportation, Chicago, Illinois, August. 13-16, 2006, pp. 653–658; https://doi.org/10.1061/40799(213)104
-
17
Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation
Lee, Eul-Bum; Choi, K.H., Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation, Preprints of the Transportation Research Board 85th Annual Meeting (CD-ROM: paper no: 06-1817), Transportation Research Board, National Research Council, Washington, D.C., 2006.
-
16
CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) Software
Lee, Eul-Bum; Samadian, M., CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) Software, Focus, Federal Highway Administration, June, 2006;
-
15
Automated Work Zone Information System have been reducing traffic demand through construction work zones
Lee, Eul-Bum; Thomas, D., Handling the demand: Automated Work Zone Information System have been reducing traffic demand through construction work zones, Safety 2006, Road and Bridges, Scranton Gillette Communications, Inc., pp. 6-9.
-
14
Innovative Fast-Track Approach to Concrete Pavement Rehabilitation in Urban Highway Network
Lee, Eul-Bum; Choi, K., Innovative fast-track approach to concrete pavement rehabilitation in urban highway network, Paper No. 15359, Airfield and Highway Pavements Meeting Today's Challenges with Emerging Technologies, ASCE, Atlanta, Georgia, April. 30-May. 3, 2006, pp. 897–911. https://doi.org/10.1061/40838(191)76
-
13
Pre- and Post-construction Analysis of Interstate 15 (Devore) Concrete Pavement Reconstruction Project
Lee, Eul-Bum; Choi, K.; Harvey, J.T., Pre- and Post-construction Analysis of Interstate 15 (Devore) Concrete Pavement Reconstruction Project, Research report submitted to California Department of Transportation (UCPRC-RR-2005-14), University of California at Berkeley, Institute of Transportation Studies, UC Pavement Research Center, December, 2005.
-
12
A Validation Study of Microscopic Traffic Simulations for Urban Freeway Reconstruction with High-traffic Volume
Lee, Eul-Bum; Kim, C.M., A Validation Study of Microscopic Traffic Simulations for Urban Freeway Reconstruction with High-traffic Volume, Paper No.: 4760, 12th ITS World Congress, San Francisco, California, November. 6-10, 2005.
-
11
Evaluation of Automatic Work Zone Information System for Urban Freeway Reconstruction with High Traffic Volume
Lee, Eul-Bum; Kim, C.M.; Harvey, J.T., Evaluation of Automatic Work Zone Information System for Urban Freeway Reconstruction with High Traffic Volume, Paper: 4070, 12th ITS World Congress, San Francisco, California November. 6-10, 2005.
-
10
Innovation and Technologies for Accelerated Highway Rehabilitation Projects: CA4PRS Implementation
Lee, Eul-Bum; Ibbs, C.W.; Harvey, J.T., Innovation and Technologies for Accelerated Highway Rehabilitation Projects: CA4PRS Implementation, paper no.: PICM05-0058, International Conference on Construction Engineering and Management, Seoul, South Korea, Oct. 16-19, 2005.
-
9
Innovative approach to rapid rehabilitation of concrete pavement on urban highway, International Society for Concrete Pavements
Lee, Eul-Bum; Harvey, J.T.; Choi, K.H.; Thomas, K.D., Innovative approach to rapid rehabilitation of concrete pavement on urban highway, International Society for Concrete Pavements, 8th International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18, 2005, Volume 3, pp. 1066–1086. https://doi.org/10.33593/iccp.v8i1.578
-
8
Concrete pavement in desert environments: An investigation of design and construction issues
Harvey, J.T.; Lee, Eul-Bum; Lamour V.; Kannekanti, V.; Bian, Y., Concrete pavement in desert environments: An investigation of design and construction issues, International Society for Concrete Pavements, International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18, 2005, Volume 1, pp. 299–321. https://doi.org/10.33593/iccp.v8i1.544
-
7
Accelerated Pavement Rehabilitation on Urban Highways: innovative approach in California
Lee, Eul-Bum; Samadian, M.; Lee, H. J., Accelerated Pavement Rehabilitation on Urban Highways: innovative approach in California (paper # 7448), Construction Research Congress, ASCE, San Diego, CA, April. 5-7, 2005. https://doi.org/10.1061/40754(183)97
-
6
Application of Macro- and Microscopic Simulations for the Traffic Planning of Urban Highway Reconstruction
Lee, Eul-Bum; Harvey, J.T.; Kim, C.M., Application of Macro- and Microscopic Simulations for the Traffic Planning of Urban Highway Reconstruction, Preprints of the Transportation Research Board 84th Annual Meeting (CD-ROM: paper no: 05-1552), Transportation Research Board, National Research Council, Washington, D.C., January, 2005.
-
5
CA4PRS software generates pavement rehabilitation strategies
Lee, Eul-Bum; Harvey, J.T.; M., Samadian, CA4PRS software generates pavement rehabilitation strategies, TR News,2004, no. 232, pp. 12–13.
-
4
A Construction Planning and Evaluation Tool for Urban Freeway Rehabilitation Projects, International Society for Asphalt Pavements
Lee, Eul-Bum; Harvey, J.T., A Construction Planning and Evaluation Tool for Urban Freeway Rehabilitation Projects, International Society for Asphalt Pavements, International Conference: Design and Construction of Long Lasting Asphalt Pavements, Auburn University, Alabama, June. 7-9, 2004.
-
3
CA4PRS Generates Pavement Rehabilitation Strategies
Lee, Eul-Bum; Harvey, J. T.; Samadian, M., CA4PRS Generates Pavement Rehabilitation Strategies, TR News, Transportation Research Board, Washington, D.C., Number 232, May-June, 2004, pp. 12-13; http://onlinepubs.trb.org/onlinepubs/trnews/trnews232.pdf
-
2
Fast-Track Asphalt Concrete Pavement Rehabilitation on I-710 Long Beach (CA) during 55-hour Weekend Closures
Lee, Eul-Bum; Lee, HJ; Monismith, C; Harvey, J.T, Fast-Track Asphalt Concrete Pavement Rehabilitation on I-710 Long Beach (CA) during 55-hour Weekend Closures, Preprints of the Transportation Research Board 83rd Annual Meeting (CD-ROM: paper no: 04-3156), Transportation Research Board, National Research Council, Washington, D.C., January, 2004.
-
1
Case Study of Urban Concrete Pavement Reconstruction and Traffic Management for the I-10 (Pomona, CA) Project
Lee, Eul-Bum; Roesler, J.R.; Harvey, J.T.; Ibbs, C.W., Case Study of Urban Concrete Pavement Reconstruction and Traffic Management for the I-10 (Pomona, CA) Project, Research Reports and Findings (Contract No: DTFH61-99-X-00008), Federal Highway Administration (FHWA) and Innovative Pavement Research Foundation (IPRF), Falls Church, VA, 2000; http://www.dot.ca.gov/research/roadway/llprs/final_iprf_report_i-10_project.pdf