-
75
ADS-LI: A Drone Image-based Segmentation Model for Sustainable Maintenance of Lightning Rods and Insulators in Steel Plant Power Infrastructure
Kim, Hyeong-Rok; Choi, So-Won;, Lee, ,Eul-Bum*; and Kim, Geon-Woo. ADS-LI: A Drone Image-Based Segmentation Model for Sustainable Maintenance of Lightning Rods and Insulators in Steel Plant Power Infrastructure, Sustainability, volume 17, issue 24, 11151; https://doi.org/10.3390/su172411151
-
74
Study on Energy Efficiency and Maintenance Optimization of Run-Out Table in Hot Rolling Mills Using Long Short-Term Memory-Autoencoders
Yun, Ju-Woong; Choi, So-Won; Lee, Eul-Bum*. Study on Energy Efficiency and Maintenance Optimization of Run-Out Table in Hot Rolling Mills Using Long Short-Term Memory-Autoencoders. Energies 2025 April, Volume 18, Issue 9, 2295. https://doi.org/10.3390/en18092295
-
73
Artificial Intelligence-Driven Approach to Optimizing Boiler Power Generation Efficiency: The Advanced Boiler Combustion Control Model
Lee, Kyu-Jeong; Choi, So-Won; Lee, Eul-Bum*. Artificial Intelligence-Driven Approach to Optimizing Boiler Power Generation Efficiency: The Advanced Boiler Combustion Control Model. Energies 2025 February, Volume 18, Issue 4, 820. https://doi.org/10.3390/en18040820
-
72
Hazard Identification and Risk Assessment During Simultaneous Operations in Industrial Plant Maintenance Based on Job Safety Analysis
Kwon, Sung-Jin; Choi, So-Won; Lee, Eul-Bum*. Hazard Identification and Risk Assessment During Simultaneous Operations in Industrial Plant Maintenance Based on Job Safety Analysis. Sustainability 2024 October, Volume 16, Issue 21, 9277. https://doi.org/10.3390/su16219277
-
71
Auto-Routing Systems (ARSs) with 3D Piping for Sustainable Plant Projects Based on Artificial Intelligence (AI) and Digitalization of 2D Drawings and Specifications
Kang, Dong-Han; Choi, So-Won; Lee, Eul-Bum*; and Kang, Sung-O. Auto-Routing Systems (ARSs) with 3D Piping for Sustainable Plant Projects Based on Artificial Intelligence (AI) and Digitalization of 2D Drawings and Specifications. Sustainability 2024 March, Volume 16, Issue 7, 2770 https://doi.org/10.3390/su16072770
-
70
Development of Cycloid-Shaped Roll Charging Chute for Sintering Process for Energy Decarbonization and Productivity Improvement in Steel Plants
Kwon, Woo-Hyeon; Choi, So-Won; and Lee, Eul-Bum* Development of Cycloid-Shaped Roll Charging Chute for Sintering Process for Energy Decarbonization and Productivity Improvement in Steel Plants. Energies 2024 March, Volume 17, Issue 7, 1536. https://doi.org/10.3390/en17071536
-
69
Prediction Modeling of Flue Gas Control for Combustion Efficiency Optimization for Steel Mill Power Plant Boilers Based on Partial Least Squares Regression (PLSR)
Lee, Sang-Mok; Choi, So-Won; and Lee, Eul-Bum*, Prediction Modeling of Flue Gas Control for Combustion Efficiency Optimization for Steel Mill Power Plant Boilers Based on Partial Least Squares Regression (PLSR), Energies, 2023 September, Volume 16 (Issue 19), 6907; https://doi.org/10.3390/en16196907
-
68
A Question-Answering Model Based on Knowledge Graphs for the General Provisions of Equipment Purchase Orders for Steel Plants Maintenance
Lee, Sang-Hyuk; Choi, So-Won; and Lee, Eul-Bum*, A Question-Answering Model Based on Knowledge Graphs for the General Provisions of Equipment Purchase Orders for Steel Plants Maintenance, Electronics, 2023 June, Volume 12 (Issue 11), 2504; https://doi.org/10.3390/electronics12112504
-
67
A Prediction Model for Spot LNG Prices Based on Machine Learning Algorithms to Reduce Fluctuation Risks in Purchasing Prices
Yang, Sun-Feel; Choi, So-Won; and Lee, Eul-Bum*, A Prediction Model for Spot LNG Prices Based on Machine Learning Algorithms to Reduce Fluctuation Risks in Purchasing Prices, Energies, 2023 May, Volume 16 (Issue 11), 4271; https://doi.org/10.3390/en16114271
-
66
Modeling of Predictive Maintenance Systems for Laser-Welders in Continuous Galvanizing Lines Based on Machine Learning with Welder Control Data
Choi, Jin-Seong; Choi, So-Won; and Lee, Eul-Bum*, Modeling of Predictive Maintenance Systems for Laser-Welders in Continuous Galvanizing Lines Based on Machine Learning with Welder Control Data, Sustainability, 2023 May, Volume 15 (Issue 9), 7676; https://doi.org/10.3390/su15097676
-
65
Machine Learning-Based Tap Temperature Prediction and Control for Optimized Power Consumption in Stainless Electric Arc Furnaces (EAF) of Steel Plants
Choi, So-Won; Seo, Bo-Guk; and Lee, Eul-Bum*, Machine Learning-Based Tap Temperature Prediction and Control for Optimized Power Consumption in Stainless Electric Arc Furnaces (EAF) of Steel Plants, Sustainability, 2023 April, Volume 15 (Issue 8), 6393; https://doi.org/10.3390/su15086393
-
64
Knowledge Retrieval Model Based on a Graph Database for Semantic Search in Equipment Purchase Order Specifications for Steel Plants
Cha, Ho-Jin; Choi, So-Won; Lee, Eul-Bum*; and Lee, Duk-Man, Knowledge Retrieval Model Based on a Graph Database for Semantic Search in Equipment Purchase Order Specifications for Steel Plants, Sustainability, 2023 April, Volume 15 (Issue 7), 6319; https://doi.org/10.3390/su15076319
-
63
An AI-Based Automatic Risks Detection Solution for Plant Owner’s Technical Requirements in Equipment Purchase Order
Kim, Chae-Yeon; Jeong, Jong-Gwan; Choi, So-Won; and Lee, Eul-Bum*, An AI-Based Automatic Risks Detection Solution for Plant Owner’s Technical Requirements in Equipment Purchase Order, Sustainability, 2022 August, Volume 14 (Issue 16), 10010. https://doi.org/10.3390/su141610010
-
62
Contractor’s Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) Technology
Choi, So-Won; and Lee, Eul-Bum*, Contractor’s Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) Technology, Sustainability, 2022 June, Volume 14 (Issue 11), 6938; https://doi.org/10.3390/su14116938
-
61
A Digitalized Design Risk Analysis Tool with Machine-Learning Algorithm for EPC Contractor’s Technical Specifications Assessment on Bidding
Park, Min-Ji; Lee, Eul-Bum*; Lee, Seung-Yeab; and Kim, Jong-Hyun, A Digitalized Design Risk Analysis Tool with Machine-Learning Algorithm for EPC Contractor’s Technical Specifications Assessment on Bidding, Energies, 2021 September, Volume 14 (Issue 18), 5901; https://doi.org/10.3390/en14185901
-
60
The Engineering Machine-Learning Automation Platform (EMAP): A Big-Data-Driven AI Tool for Contractors’ Sustainable Management Solutions for Plant Projects
Choi, So-Won; Lee, Eul-Bum*; Kim, Jong-Hyun, Engineering Machine-Learning Automation Platform (EMAP): The Engineering Machine-Learning Automation Platform (EMAP): A Big-Data-Driven AI Tool for Contractors’ Sustainable Management Solutions for Plant Projects, Sustainability, 2021 September, Volume 13 (Issue 18), 10384; https://doi.org/10.3390/su131810384
-
59
AI and Text-Mining Applications for Analyzing Contractor’s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects
Choi, Su Jin; Choi, So Won; Kim, Jong Hyun; Lee, Eul-Bum*, AI and Text-Mining Applications for Analyzing Contractor’s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects, Energies, 2021 July, Volume 14 (Issue 15), 4632; https://doi.org/10.3390/en14154632
-
58
Performance Evaluation of Normalization-based CBR Models for Improving Construction Cost Estimation
Anh, Joseph; Park, Moonseo; Lee, Hyun-Soo; Ahn, Sung Jin; Kwon, Nahyun; Lee, Eul-Bum*; and Kim, Yonggu, Performance Evaluation of Normalization-based CBR Models for Improving Construction Cost Estimation, Automation in Construction, 2020 November, Volume 119 (103329); https://doi.org/10.1016/j.autcon.2020.103329
-
57
Mitigating the Legal Challenges of Imposing Disincentives on Non-Performing Transportation Projects
Alleman, Douglas; Lee, Eul-Bum*, Mitigating the Legal Challenges of Imposing Disincentives on Non-Performing Transportation Projects, Journal of Engineering, Construction and Architectural Management, 2020 October, volume 27 (Issue 10), pp. 2859-2891; https://doi.org/10.1108/ECAM-04-2019-0188
-
56
Integrating CA4PRS V.3 road widening schedule module into US highway early constructability process: California SR-91 corridor improvement program case study
Lee, Eul-Bum*; Alleman, Douglas*; Thomas, David; Kim, Chang-Mo, Integrating CA4PRS V3 Road Widening Schedule Module into US Highway Early Constructability Review Process – California SR-91 Corridor Improvement Program Case Study, Transport, 2020 January, volume 35 (1), pp.1-19; https://doi.org/10.3846/transport.2019.11650
-
55
Electrical Power Characteristics and Economic Analysis of Distributed Generation System Using Renewable Energy: Applied to Iron and Steel Plants
Shin, Hee-Kwan; Cho, Jae-min; Lee, Eul-Bum*, Electrical Power Characteristics and Economic Analysis of Distributed Generation System Using Renewable Energy: Applied to Iron and Steel Plants, Sustainability, 2019 November, Volume 11 (Issue 22), 6199; https://doi.org/10.3390/su11226199
-
54
A Digitization and Conversion Tool for Imaged Drawings to Intelligent Piping and Instrumentation Diagrams (P&ID)
Kang, Seong-Oh; Lee, Eul-Bum*; Baek, Hum-Kyung, A Digitization and Conversion Tool for Imaged Drawings to Intelligent Piping and Instrumentation Diagrams (P&ID), Energies, 2019 July, volume 12 (issue 13), 2593; https://doi.org/10.3390/en12132593
-
53
A Forecast Model for the Level of Engineering Maturity Impact on Contractor’s Procurement and Construction Costs for Offshore EPC Megaprojects
Kim, Myung-Hun; Lee, Eul-Bum*, A Forecast Model for the Level of Engineering Maturity Impact on Contractor's Procurement and Construction Costs for Offshore EPC Megaprojects, Energies, 2019 June, volume 12 (issue 12), 2295; https://doi.org/10.3390/en12122295
-
52
Geographic Information System–Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items
Le, Chau; Le, Tuyen; Jeong, H. David; and Lee, Eul-Bum*, Geographic Information System-Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items, Journal of Construction Engineering and Management, 2019 May, Volume 145 (Issue 8); https://doi.org/10.1061/(ASCE)CO.1943-7862.0001672
-
51
Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process
Son, Byeong-yoon; Lee, Eul-Bum*, Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process, Energies, 2019 May, volume 12(issue 10), 1956; http://dx.doi.org/10.3390/en12101956
-
50
Reducing the Superheating of Extraction Stream on Advanced-Ultra Super Critical Power Plants with Regenerative Turbines in South Korea: An Economic Analysis
Cho, Dong-Jin; Lee, Eul-Bum*; Cho, Jae-Min; and Alleman, Douglas, Reducing the Superheating of Extraction Stream on Advanced-Ultra Super Critical Power Plants with Regenerative Turbines in South Korea: An Economic Analysis, Energies, 2019 May, volume 12 (issue 9), 1681; https://doi.org/10.3390/en12091681
-
49
The Efficacy of the Tolling Model’s Ability to Improve Project Profitability on International Steel Plants
Kim, Dong-Hyun; Lee, Eul-Bum*; Jung, In-Hyeo; and Alleman, Douglas, The Efficacy of the Tolling Model’s Ability to Improve Project Profitability on International Steel Plants, Energies, 2019 March, volume 12 (issue 7), 1221; https://doi.org/10.3390/en12071221
-
48
Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses
Yi, Daekyoung; Lee, Eul-Bum*; Ahn, Junyong, Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses, Sustainability, 2019 March, volume 11 (issue 6), 1613; https://doi.org/10.3390/su11061613
-
47
A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects
Kim, Myung-Hun; Lee, Eul-Bum*; Choi, Han-Suk, A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects, Sustainability, 2019 February, volume 11 (issue 5), 1256; https://doi.org/10.3390/su11051256
-
46
Reducing Voltage Volatility with Step Voltage Regulators: A Life-Cycle Cost Analysis of Korean Solar Photovoltaic Distributed Generation
Jeong, Yu-Cheol; Lee, Eul-Bum*; Alleman, Douglas, Reducing Voltage Volatility with Step Voltage Regulators: A Life-Cycle Cost Analysis of Korean Solar Photovoltaic Distributed Generation, Energies, 2019 February, volume 12 (issue 4), 652; https://doi.org/10.3390/en12040652
-
45
Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy Process—Fuzzy Inference System
Kim, Min-Sung; Lee, Eul-Bum*; Jung, In-Hye, and Alleman, Douglas, Risk Assessment and Mitigation Model for Overseas Steel-plant Projects Investment with Analytic Hierarchy Process – Fuzzy Inference System, Sustainability, 2018 December, volume 10 (issue 12), 4780; https://doi.org/10.3390/su10124780
-
44
A method for analyzing the effect of implementing an enterprise system based on the complexity of activities
Lee, Chi-Joo; Lee, Chiheyon; Lee, Eul-Bum*, A Method for Analyzing the Effect of Implementing An Enterprise System Based on the Complexity of Activities, Journal of Civil Engineering and Management, 2018 November, volume 24 (issue 7), pp. 526-536; https://doi.org/10.3846/jcem.2018.6130
-
43
Ore Composition’s Impact on Smelting Profitability: An Optimum Pricing Index Model for Long-Term Nickel Ore Feedstock Purchasing Agreements
Jeong, Ho-Hyun; Lee, Eul-Bum*; Alleman, Douglas; Ore Composition’s Impact on Smelting Profitability: An Optimum Pricing Index Model for Long-Term Nickel Ore Feedstock Purchasing Agreements, Applied Sciences, 2018 November, volume 8 (issue 11), 2100; https://doi.org/10.3390/app8112100
-
42
Method for Predicting Raw Material Prices for Product Production over Long Periods
Lee, Chi-Joo; Won, Jong-Sung Won and Lee, Eul-Bum*, Method for Predicting Raw Material Prices for Product Production over Long Periods, Journal of Construction Engineering and Management, 2018 October, volume 145 (issue 1); https://doi.org/10.1061/(ASCE)CO.1943-7862.0001586
-
41
Optimization Simulation, Using Steel Plant Off-Gas for Power Generation: A Life-Cycle Cost Analysis Approach
Kim, Yang-Kon; Lee, Eul-Bum*; Optimization Simulation, Using Steel Plant Off-Gas for Power Generation: A Life-Cycle Cost Analysis Approach, Energies, 2018 October, volume 11 (issue 11), 2884; https://doi.org/10.3390/en11112884
-
40
Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants
Lee, Hyun-Chul; Lee, Eul-Bum*; Alleman, Douglas; Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants, Energies, 2018 October, volume 11 (issue 10), 2850; https://doi.org/10.3390/en11102850
-
39
Analysis of the causes and level of maintenance for enterprise systems in construction companies
Lee, Chi-Joo; Lee, Chiheyon; Lee, Eul-Bum*, Analysis of the Causes and Level of Maintenance for Enterprise Systems in Construction Companies, Journal of Civil Engineering and Management, 2018 October, volume 24 (issue 6), pp. 499-507; https://doi.org/10.3846/jcem.2018.5635
-
38
Learning method for knowledge retention in CBR cost models
Ji, Sae-Hyun; Ahn, Joseph; Lee, Eul-Bum*; Yonggu Kim, Learning Method for Knowledge Retention in CBR Cost Models, Automation in Construction, 2018 December, volume 96, pp. 65-74; https://doi.org/10.1016/j.autcon.2018.08.019
-
37
Power Plant Economic Analysis: Maximizing Lifecycle Profitability by Simulating Preliminary Design Solutions of Steam-Cycle Conditions
Hong, Chul-Seung and Lee, Eul-Bum*, Power Plant Economic Analysis: Maximizing Lifecycle Profitability by Simulating Preliminary Design Solutions of Steam-Cycle Conditions, Energies, 2018 August, volume 11 (issue 9), 2245; https://doi.org/10.3390/en11092245
-
36
Recommended Finite Element Formulations for the Analysis of Offshore Blast Walls in an Explosion
Kim, Do-Kyun.; NG, William; Hwang, O.J.; Shon, J.M.; Lee, Eul-Bum*, Recommended Finite Element Formulations for the Analysis of Offshore Blast Walls in an Explosion, Latin American Journal of Solids and Structures, 2018 August, volume 15 (10); https://www.lajss.org/index.php/LAJSS/article/view/5172
-
35
Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors’ Schedule-Cost Performance for Offshore Oil and Gas EPC Projects
Kim, Myung-Hun; Lee, Eul-Bum*, and Choi, Han-Suk; Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors’ Schedule-Cost Performance for Offshore Oil and Gas EPC Projects, Sustainability, 2018 July, volume 10 (issue 7), 2469; https://doi.org/10.3390/su10072469
-
34
A Method for the Empirical Formulation of Current Profile
Kim, D.K.; Wong, E.W.C.; Lee, Eul-Bum*; Yu, S.Y.; Kim, Y.T., A Method for the Empirical Formulation of Current Profile, Ships and Offshore Structures, 2018 June, volume 14 (issue 2); https://doi.org/10.1080/17445302.2018.1488340
-
33
Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process
Jo, Sung-Hwan; Lee, Eul-Bum*, and Pyo, Kyoung-Youl, Integrating A Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process”, Sustainability, 2018 May, volume 10 (issue 6), 1817; https://doi.org/10.3390/su10061817
-
32
Balancing Project Financing and Mezzanine Project Financing with Option Value to Mitigate Sponsor’s Risks for Overseas Investment Projects
Yoo, Jae-Il; Lee, Eul-Bum*; and Choi, Jin-Woo, Balancing Project Financing and Mezzanine Project Financing with Option Value to Mitigate Sponsor’s Risks for Overseas Investment Projects, Sustainability, 2018 May, volume 10 (issue 5), 1498; https://doi.org/10.3390/su10051498
-
31
Optimal Investment Timing with Investment Propensity Using Fuzzy Real Options Valuation
Kim, Yonggu; Lee, Eul-Bum*, Optimal Investment Timing with Investment Propensity Using Fuzzy Real Options Valuation, International Journal of Fuzzy Systems, 2018 May, volume 20; https://doi.org/10.1007/s40815-018-0493-4
-
30
A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk
Kim, Yonggu and Lee, Eul-Bum*, A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk, Sustainability, 2018 March, volume 10 (issue 3), 747; https://doi.org/10.3390/su10030747
-
29
Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings
Lee, Eul-Bum* and Alleman, Douglas, Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings, Sustainability, 2018 March, volume 10 (issue 3), 701; https://doi.org/10.3390/su10030701
-
28
Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca)
Lee, Eul-Bum*; Thomas, D. K.; Alleman, D., Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca), Sustainability, 2018 January, volume 10 (issue 1), 179; https://doi.org/10.3390/su10010179; SI: Sustainable Urban and Rural Development
-
27
Probabilistic Cash Flow-Based Optimal Investment Timing Using Two-Color Rainbow Options Valuation for Economic Sustainability Appraisement
Kim, Yong-gu; Shin, Kee-young; Ahn, Joseph; and Lee, Eul-Bum*, Probabilistic Cash Flow-Based Optimal Investment Timing Using Two-Color Rainbow Options Valuation for Economic Sustainability Appraisement, Sustainability, 2017 October, volume 9 (issue 10), 1781; https://doi.org/10.3390/su9101781; SI: Sustainable Urban & Rural Development
-
26
Automated Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA)
Kim, C.M.; Lee, Eul-Bum*; Harvey, J. T.; Fong, A.; Lott, R., Automatic Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA), International Journal of Transportation Science and Technology (IJTST): Sustainable Transportation Technology and Policy, 2015 March, volume 4 (issue 1), pp. 86-96; https://doi.org/10.1260/2046-0430.4.1.61
-
25
Prediction method of real discount rate to improve accuracy of life-cycle cost analysis
Lee, C.J.* and Lee, Eul-Bum*, A prediction method of real discount rate to improve accuracy of life-cycle cost analysis, Energy and Buildings, impact factor=4.457, 2017 January, volume 135, pp. 225–232; https://doi.org/10.1016/j.enbuild.2016.11.020
-
24
Fatigue in Highway Construction Workers: Risks and Countermeasures in Rapid Renewal Project Schedules
Jackson, J. E.; Sanquist, T.; Campbell, J.; Lee, Eul-Bum*; Hans P.A.; Van Dongen, H. P., Fatigue Risk Management for Construction Worker on Rapid Renewal Highway Projects, Transportation Research Record , Journal of the Transportation Research Board, 2013 October National Research Council, Washington, D.C., pp. 11-18; https://doi.org/10.3141/2347-02
-
23
Life cycle energy consumption and GHG emission from pavement rehabilitation with different rolling resistance
Wang, Ting; Lee, In-Sung; Kendal, Alissa; Harvey, John; Lee, Eul-Bum*; Kim, Chang-Mo, Life Cycle Energy Consumption and GHG Emission from Pavement Rehabilitation with Different Rolling Resistance, Journal of Cleaner Production, 2012 September, volume 33, pp. 86-96; https://doi.org/10.1016/j.jclepro.2012.05.001
-
22
Value Analysis Using Performance Attributes Matrix for Highway Rehabilitation Projects: California Interstate 80 Sacramento Case
Lee, Eul-Bum*; Kim, C. M.; Ghafari, N.; and Brink, G., Value Analysis Using Performance Attributes Matrix for Highway Rehabilitation Projects: California Interstate 80 Sacramento Case, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2228, TRB, National Research Council, Washington, D.C., pp. 34-43; https://doi.org/10.3141/2228-05
-
21
Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1
Lee, Eul-Bum*; Kim, C.M.; and Harvey, J. T., Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2227, TRB, National Research Council, Washington, D.C., pp. 23-32; https://doi.org/10.3141/2227-03
-
20
Economic Benefits Assessment of Accelerated Pavement Testing Research in California: Case Study
du Plessis, L.; Nokes, W. A.; Mahdavi, M.; Burmas, N.; Holland, T.J.; Lee, Eul-Bum*, Economic Benefits Assessment of Accelerated Pavement Testing Research in California: Case Study, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2225, TRB, National Research Council, Washington, D.C., pp. 137-1461; https://doi.org/10.3141/2225-15
-
19
Multifaceted public outreach and cost–benefit analysis for its effectiveness validation
Choi, K.H.; Lee, Eul-Bum*; and Ibbs, C.W., Multifaceted Public Outreach and Cost-Benefit Analysis for Its Effectiveness Validation, Journal of Construction Management and Economics, 2009 September, volume 27 (issue 8), pp. 771-782; https://doi.org/10.1080/01446190903096591
-
18
Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks
Lee, Eul-Bum*; Choi, K.H.; and Lim, D. S., Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks, Transportation Research Record, Journal of the Transportation Research Board, 2008 January, No. 2081, TRB, National Research Council, Washington, D.C., pp. 38-45; https://doi.org/10.3141/2081-04
-
17
State-of-Practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience
Lee, Eul-Bum* and Thomas, D. K., State-of-practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience, Journal of Construction Engineering and Management, 2007 February, ASCE, volume 133 (issue 2), pp. 105-113; https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(105)
-
16
Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction
Lee, Eul-Bum*; Lee, H.J.; and Ibbs, C.W., Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction, Journal of Construction Engineering and Management, 2007 October, ASCE, volume 133 (issue 10), pp. 798-806; https://doi.org/10.1061/(ASCE)0733-9364(2007)133:10(798)
-
15
Implementation of Automated Travel-Time Information and Public Reaction on Urban Highway Rehabilitation
Lee, Eul-Bum*; Kim, C.M.; and Harvey, J.T., Implementation of automated travel-time information and public reaction on urban highway rehabilitation, Journal of Transportation Engineering, 2006 October, ASCE, volume 132 (issue 10), pp. 808-816; https://doi.org/10.1061/(ASCE)0733-947X(2006)132:10(808)
-
14
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Lee, Eul-Bum*; Lee, H.J.; and Harvey, J.T., Fast-Track Urban Freeway Rehabilitation with 55-hour Extended Weekend Closures: I-710 Long Beach Case Study, Journal of Construction Engineering and Management, 2006 May, ASCE, volume 132 (issue 5), pp. 465-472; https://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(2006)132:5(465)
-
13
Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network
Lee, Eul-Bum* and Choi, K.H., Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network, Transportation Research Record, Journal of the Transportation Research Board, 2006 January, No. 1949, TRB, National Research Council, Washington, D.C., pp. 3-10; https://doi.org/10.1177/0361198106194900101
-
12
Automated Work Zone Information System on Urban Freeway Rehabilitation: California Implementation
Lee, Eul-Bum* and Kim, C.M., Automated Work-Zone Information System on Urban Freeway Rehabilitation: California Implementation, Transportation Research Record, Journal of the Transportation Research Board, 2006 January, No. 1948, TRB, National Research Council, Washington, D.C., pp. 77-85; https://doi.org/10.3141/1948-09
-
11
Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis
Lee, Eul-Bum*; Ibbs, C.W.; and Thomas, D. K., Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis, Journal of Infrastructure Management Systems, 2005 December, ASCE, volume 11 (issue 4), pp. 250-257; https://doi.org/10.1061/(ASCE)1076-0342(2005)11:4(250)
-
10
Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule
Lee, Eul-Bum*; Thomas, D. K.; and Bloomberg, L., Planning Urban-Highway Reconstruction with Traffic Demand Affected by Construction Schedule, Journal of Transportation Engineering, 2005 October, ASCE, volume 11 (issue 4), pp. 752-761; https://doi.org/10.1061/(ASCE)0733-947X(2005)131:10(752)
-
9
Knowledge-Based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects
Lee, Eul-Bum*; Harvey, J.T.; and Samadian, M., Knowledge-based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects, Transportation Research Recor, Journal of the Transportation Research Board, 2005 January, No. 1907, TRB, National Research Council, Washington, D.C., pp. 15-14; https://doi.org/10.1177/0361198105190700103
-
8
Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
Lee, Eul-Bum*; Harvey, J.T.; and Thomas, D. K., Integrated Design/Construction/Operations Analysis for Fast-track Urban Freeway Reconstruction, Journal of Construction Engineering and Management, 2005 May, ASCE, volume 131 (issue 12), pp. 1283-1291; https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1283)
-
7
Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies
Lee, Eul-Bum*; and Ibbs, C.W, Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies, Journal of Construction Engineering and Management, 2005 April, ASCE, volume 131 (issue 4), pp. 449-458; https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(449)
-
6
Accelerated Pavement Rehabilitation and Reconstruction with Long-Life Asphalt Concrete on High-Traffic Urban Highways
Lee, Eul-Bum*; Lee, H.J.; and Akbarian M., Accelerated Pavement Rehabilitation and Reconstruction with Long-life Asphalt Concrete on High-trafficked Urban Highway, Transportation Research Record, Journal of the Transportation Research Board, 2005 January, No. 1905, TRB, National Research Council, Washington, D.C., pp. 56-66; https://doi.org/10.1177/0361198105190500106
-
5
Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors
Lee, Eul-Bum*; Harvey, J.T.; Ibbs, C.W.; and St. Martin, J., Constructability Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors, Transportation Research Record, Journal of the Transportation Research Board, 2002 January, No. 1813, TRB, National Research Council, Washington, D.C., pp. 285-294; https://doi.org/10.3141/1813-34
-
4
Case Study of Urban Concrete Pavement Reconstruction on Interstate 10
Lee, Eul-Bum*; Roesler, J.R.; Harvey, J.T.; and Ibbs, C.W., Case Study of Urban Concrete Pavement Reconstruction on Interstate 10, Journal of Construction Engineering and Management, 2002 February, ASCE, volume 128 (issue 1), pp. 49-56; https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(49)
-
3
Constructability Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors
Lee, Eul-Bum*; Harvey, J.T.; Ibbs, C.W.; and St. Martin, J., Constructability Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors, Transportation Research Record, Journal of the Transportation Research Board, 2002 January, No. 1813, TRB, National Research Council, Washington, D.C., pp. 285-294; https://doi.org/10.3141/1813-34
-
2
Calcool: A multi-layer Asphalt Pavement Cooling Tool for Temperature Prediction During Construction
Timm, D.; Voller, V.R; Lee, Eul-Bum*; and Harvey, J.T., Calcool: A Multi-layer Asphalt Pavement Cooling Tool for Temperature Prediction During Construction, The International Journal of Pavement Engineering, 2001, volume 2 (issue 3), pp. 169-185; https://doi.org/10.1080/10298430108901725
-
1
Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors
Lee, Eul-Bum*; Ibbs, C.W.; Roesler, J.R.; and Harvey, J.T., Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors, Transportation Research Record, Journal of the Transportation Research Board, 2000 January, No. 1712, TRB, National Research Council, Washington, D.C., pp. 13-22; https://doi.org/10.3141/1712-02